Temporary flow monitoring was undertaken at 46 sites within the wastewater collection system. Data collected was used in the hydraulic model calibration. Five rainfall gauges were installed to calibrate NEXRAD radar images and provide digital rainfall distribution analysis over the monitored service areas.

Priority ranking of basins for subsequent inspection and smoke testing was presented in the final report. Prepared a CMOM self-audit report as part of TCEQ requirements and assisted City in preparing the SSO Initiative ten year plan. Pipeline Analysis performed the condition assessment of 29,000 linear feet of 48 inch interceptor using laser profiling, high definition television and sonar.

Client: City of Garland
Project Manager: James H. Forbes, Jr., P.E.
Owner Representative: Brent Erickson